A comprehensive, sourced directory of announced and operating data center campuses across Missouri. Every record references state economic development announcements, PSC utility filings, or local planning commission agendas. Missing or undisclosed figures are strictly labeled 'Not publicly disclosed'.

Methodology: We track projects within the state boundaries of Missouri. Kansas projects (e.g. Wyandotte or Johnson County) are excluded.
Showing 8 of 8 tracked projects
OperatingAugust 2025

Meta Kansas City Data Center Campus

Kansas City, Clay / Platte Counties (Kansas City Metro)

Meta's flagship multi-building cloud campus at Golden Plains Technology Park in Kansas City, Missouri. Operating since August 2025, supported by Missouri DED certified data center exemption.

Operator
Meta (Facebook)
Announced Investment
$1.0+ Billion
Power Capacity
Not publicly disclosed (Served by Evergy large-load tariff)
Cooling System
Direct evaporative with dry cooling optimization; 100% renewable energy procurement matching
Jobs (Announced Trades / Ops)
Approx. 1,400+ construction trades peak; ~100+ permanent operational roles
Meta Data Centers: Kansas City We Are Online AnnouncementPublic Record
OperatingNovember 2024

Edged Energy Kansas City Facility

Kansas City, Jackson County (Kansas City Metro)

A waterless, net-zero carbon designed AI and cloud facility operating in Jackson County, Missouri, highlighting closed-loop thermal heat rejection without water evaporative towers.

Operator
Edged Energy / Endeavour
Announced Investment
$143 Million
Power Capacity
24 MW
Cooling System
ThermalWorks waterless closed-loop modular cooling system (Ultra-low water consumption)
Jobs (Announced Trades / Ops)
200+ union construction jobs; 25 permanent tech & facility roles
Missouri DED: Edged Data Centers Opens New Facility in Kansas CityPublic Record
ApprovedMarch 2024

Google Huntwest Infrastructure Evaluation

Kansas City Northland, Clay County (Kansas City Metro)

Approved site zoning and Chapter 100 industrial revenue bond evaluation in the Northland area of Kansas City, Missouri. Separate from Kansas-side Wyandotte facilities.

Operator
Google LLC / Alphabet
Announced Investment
$600 Million (Phase 1 announced)
Power Capacity
Not publicly disclosed
Cooling System
Closed-loop system with air-cooled chillers planned
Jobs (Announced Trades / Ops)
Several hundred construction jobs; estimated 40-70 operational jobs
Google Data Centers Global Directory & Public FilingsPublic Record
OperatingSeptember 2024

Digital Realty St. Louis Hub

St. Louis, St. Louis City (St. Louis Metro)

Major carrier-neutral interconnection exchange and enterprise cloud facility in downtown St. Louis, connecting transcontinental fiber pathways with Ameren Missouri electrical grid.

Operator
Digital Realty (900 Walnut / Bandwidth)
Announced Investment
Multi-hundred million aggregate capital improvements
Power Capacity
35 MW critical load
Cooling System
Chilled water loop with economizers & direct air intake
Jobs (Announced Trades / Ops)
Approx. 45 permanent high-tech, network engineering and facilities positions
Ameren Missouri / Missouri PSC Utility Interconnection FilingsPublic Record
PlanningJanuary 2025

St. Charles County Advanced Computing Park

St. Peters / O'Fallon, St. Charles County (St. Louis Metro)

Site development proposal under county master plan review in St. Charles County corridor, requiring dedicated substation expansion under Ameren Missouri's large-load rules.

Operator
Confidential Developer / Enterprise Operator
Announced Investment
Estimated $1.2 Billion (Proposed aggregate)
Power Capacity
150 MW requested load
Cooling System
Hybrid adiabatic dry cooling with municipal non-potable backup
Jobs (Announced Trades / Ops)
Estimated 600 construction; 65 permanent operational roles
Missouri PSC Ameren Tariff Docket & County Planning AgendasPublic Record
ProposedJune 2024

Central Missouri Digital Infrastructure Park

Columbia, Boone County (Central Missouri)

Strategic location near Interstate 70 and University of Missouri research fiber ring, evaluating municipal electric and water utility interconnection.

Operator
Regional Consortium & Utility Study
Announced Investment
Not publicly disclosed
Power Capacity
75 MW initial study
Cooling System
Closed-loop chilled water with free-cooling air heat exchangers
Jobs (Announced Trades / Ops)
Approx. 300 construction trades; 35 permanent staff
Missouri DNR Industrial Water Assessment & Regional PlanningPublic Record
ProposedOctober 2024

Ozarks Regional Data Center Hub

Springfield, Greene County (Southwest Missouri)

Proposed edge and disaster-recovery compute campus leveraging Springfield City Utilities dual redundant power grid and rail/fiber junction.

Operator
City Utilities of Springfield / Private Developer
Announced Investment
Not publicly disclosed
Power Capacity
60 MW planned interconnect
Cooling System
Air-cooled dry condensers with zero consumptive evaporation
Jobs (Announced Trades / Ops)
Estimated 250 construction; 30 permanent operational roles
Missouri DED Economic Development Site Certification RegistryPublic Record
PlanningFebruary 2025

Southeast Missouri / Bootheel Energy & Data Study

New Madrid / Pemiscot Area, New Madrid County (Southeast Missouri)

Industrial brownfield and energy hub evaluation in the Missouri Bootheel region, studying high-capacity Mississippi River barge logistics and transmission corridors.

Operator
Private Energy Development Coalition
Announced Investment
Estimated $2.5+ Billion (Announced privately funded evaluation)
Power Capacity
300+ MW dedicated generation/transmission evaluation
Cooling System
Under technical engineering review (Closed loop prioritized)
Jobs (Announced Trades / Ops)
1,200 construction trades; 120 permanent technology & electrical technicians
Regional Transmission & Heavy Industrial Site Public RecordsPublic Record